Headlands Road Reconstruction Program

The following letter has been sent to affected residents:

RE:  Lake Overlook Drive Reconstruction Project

Dear Resident;

Thank you for your patience and support during the reconstruction of Lake Overlook.  We have come to our final phase of the project, which is the asphalt paving.  In order to complete the paving, we are required to remove the stone ramps to your driveway for the final grading of the road, followed by paving.  This will take a few days, and is scheduled to begin on Tuesday, August 31st.

This phase requires that you do NOT park your car in your driveway (unless you don’t need to use your car until after September 2nd), OR the roadway during the daytime hours while we remove the ramps, grade the road, and then pave.  During the evenings, when the construction crews have completed work for the day, you may park your car on the road in front of or near your house on the non-hydrant side of the street.  HOWEVER, the cars must be moved from the road by 7:00 AM the next morning.  During those days, parking is recommended on adjacent streets.  The paving crews will need access to the entire road on Tuesday (August 31), Wednesday (September 1st), AND Thursday (September 2), and if your car is not moved by 7:00 AM, it will be towed at your expense.    You will have access to your driveway at the end of the day on Wednesday (September 1), when the base course of the paving operations has been completed on the road.  We are scheduled to complete the final pavement course on Thursday (September 2).

For residents on the side streets NORTH of Lake Overlook, access to your street will not be available during the daytime hours on Tuesday and Wednesday.  Temporary ramping will be replaced Tuesday evening to allow for evening access to your residences.

If you have questions during normal working hours, please do not hesitate to call Allen Pennington (City of Mentor) at (440) 974-5786, Andy Lubonovic (CT Consultants) at (440) 742-2394 or JTO, Inc. (contractor) at (440) 352-1900. For after hour concerns please contact Leong Tan of JTO, Inc. at (440) 221-9879.  General questions can also be forwarded to pennington@cityofmentor.com.

Sincerely,

 

David A. Swiger, P.E.
City Engineer
City of Mentor

Allen E. Pennington, P.E.
Civil Engineer – Traffic
City of Mentor